Some of the costliest mistakes in a factory project happen before an architect is usually hired: buying land that cannot take the building, the traffic or the power you need. We check the site before you commit, then turn the answer into a masterplan, programme and cost estimate you can base an investment decision on.

What a due diligence study covers

For a multinational online retailer, we studied a 41,000 m² site in Taichung for a 112,200 m² logistics centre. We reviewed the regional logistics market and benchmarked five comparable facilities nearby. We tested the site against zoning, floor-area bonuses, building regulations and logistics requirements, and assessed the permit route, utilities, ground conditions, traffic access and the main entrance. The client received a masterplan, schematic design, programme and cost estimate to base its investment decision on. Read our guide to land due diligence.

Masterplanning industrial parks and campuses

GS Technology Park in Changzhou is a 126,000 m² built-to-let park on a 93,000 m² site, at a floor area ratio of 2.0, for makers of renewable energy systems and electric vehicle parts. The masterplan sets out ten factory buildings in 2,000, 4,000 and 8,000 m² modules, mostly two storeys with 10 m clear height and floor loads of 2,000 kg/m² on the ground floor. It adds a high-rise building with freely divisible units for light assembly, and an office and R&D centre beside a willow-lined pond. People and lorries use separate routes, and every available roof is planned for solar panels.

Our built factories started the same way. We masterplanned T-HAM’s processing plant in Pingtung before designing it, re-masterplanned the site of its new slaughterhouse, and masterplanned the Shan Tea complex on a 5-hectare mountaintop in Yunnan, with Phase 1 nearing completion. Beyond industry, we have masterplanned a 6.8-hectare countryside work-and-leisure campus in Dahu for a software company with more than 100 staff, and the 500 mu (about 33 ha) Yinxing Lake Cultural Park in Nanjing.

A study can also tell you not to buy

A study is worth most when it changes a decision. Many masterplans are never built as drawn: the client changes site, phases the work, or finds that the numbers do not add up. That is the study doing its job. It is far cheaper to find out on paper than after the land is bought.

We know how approvals work from the inside

As Shihlien Chemical’s in-house design managers, Richard and Stephen Wang dealt directly with local design institutes, the planning bureau, the land management bureau and city and provincial government offices. On projects in China today, we work with the licensed design institute best suited to execute each project: sometimes a local institute that knows the local authorities, sometimes one we know well, which works to our standards and collaborates with us through the necessary rounds of review and revision. That experience shapes what we check first on any site.

Rendering: aerial view of the logistics centre in its industrial setting, Taichung

Logistics Centre Site Study

Taichung, Taiwan · 112,200 m² on a 41,000 m² site · masterplan 2026
Land due diligence study and masterplan
Logistics
Rendering: aerial view of GS Technology Park, Changzhou

GS Technology Park

Changzhou, Jiangsu · 126,000 m² on a 93,000 m² site · masterplan 2023
Masterplanning and feasibility study
Technology park
Rendering: brick-vaulted lounge with a central fire pit, Dahu Recreational Retreat

Dahu Recreational Retreat

Miaoli, Taiwan · 6.8 ha site · masterplan 2023
Masterplanning
Masterplan
Rendering: lakeside buildings and the star-shaped gallery, Yinxing Lake Cultural Park

Yinxing Lake Cultural Park

Nanjing, Jiangsu · 500 mu (about 33 ha) site
Masterplan
Masterplan
Front view of the T-HAM PABP factory at dusk

T-HAM PABP Meat Processing Factory

Pingtung, Taiwan · in use since 2018
Masterplan through to construction supervision
Factory
Stone-walled ramp leading up to the terraced Shan Tea factory, Yunnan

Shan Tea Factory Complex

Yiwu, Yunnan · 5 ha site · Phase 1 nearing completion
Masterplan through to construction supervision
Production complex

Questions

What do you need from us to start?

The site address or land number, what you want to build and roughly how big, and your timeline. If you are comparing several sites, send them all.

What do we receive at the end?

On the Taichung study, the client received a masterplan, schematic design, programme and cost estimate. We agree the deliverables with you at the start.

Do you do this in China as well as Taiwan?

Our land due diligence studies are currently offered for sites in Taiwan. We masterplan in both: GS Technology Park is in Changzhou, and the Shan Tea complex is in Yunnan.

Can you design the buildings afterwards?

Yes. T-HAM and Shan Tea both went from our masterplan to our building design and construction supervision.